Fifteen jobs where a driven footing beats a poured one.
The same screw and the same equipment across all of them. The advantage grows with a hard site, a high footing count, or a schedule that cannot absorb a cure.
Protected trees
No-dig footings inside a protected root zone
Set to plan without altering soils inside a tree's critical root zone — the situation metro Atlanta's tree ordinances are written around, and the one a poured footing struggles with.
Residential
No-dig decks & additions
Footings set to plan without tearing up the yard, then framed the same day. Ideal for the tighter, tree-covered lots common across intown Atlanta.
Structures
ADUs, cabins & sheds
A level, load-rated platform on grade for accessory dwellings and outbuildings — including sloped and wooded lots where a slab is impractical.
Renewables
Solar ground-mounts
Dozens of footings driven fast and to spec, with embedment verified on every screw. Consistent reveal and racking geometry across the whole array.
Trade & contractor supply
Buy code-rated screws locally
Contractors source American Ground Screw screws, brackets, and drive accessories from us — code-rated stock held in metro Atlanta, on hand for pickup and shipped anywhere in Georgia, with sizing help.
Through existing concrete
Pergola & patio cover posts, set through a slab
Want a pergola or patio cover where an old concrete patio already sits? We bore through the slab at a diameter that clears the shaft, then drive into the soil beneath it. The patio stays where it is, the demolition bill disappears, and there is nothing to re-pour.
Delivered buildings
Level bases for prefab sheds, carports & playhouses
A delivered building needs a level, load-rated base before the truck arrives. Screws give one on a sloped or wooded lot in a morning, with no pad to pour and no waiting on a cure. We work with dealers as well as owners.
Posts
Fence, sign, light pole & flagpole posts
No bags, no mixing, no water, no cure. A driven post foundation is set and loaded the same hour, which matters most when there are dozens of them and a schedule.
Tight sites
Lots a concrete truck cannot reach
Narrow intown lots, no side access, a finished lawn nobody wants rutted. The equipment is handheld, so the footing arrives where a mixer never could — and there is no spoil pile to haul out afterwards.
Commercial
Speed-critical projects
When the schedule cannot absorb a concrete cure, driven footings keep trades moving. Signage, canopies, modular units, and phased site work stay on the critical path.
Containers
Shipping containers & container homes
A container needs level, load-rated bearing at its corner castings and nothing else. Screws give that on ground a slab would have to be poured across, and they come back out if the container ever moves on.
Renewables
Battery storage & equipment pads
Enclosures and inverter gear need a stable, level base near the array rather than a poured pad. Screws set one in the same visit as the mounts, on the same equipment.
Signage
Monument, wayfinder & drive-through signs
Sign work is many small foundations on a schedule, often on finished sites where digging means restoring landscaping afterwards. Driven posts avoid both, and breakaway and campus pole work follows the same pattern.
Waterside
Docks, boardwalks & lighting walks
Walkways along lakes and waterways where a concrete pour is impractical to get to and unwelcome next to the water. Screws are driven from the walkway as it advances.
Post-frame
Post-frame buildings & pole barns
Post-frame construction already sets its loads on discrete points, which is exactly what a screw is. It replaces the augured-and-poured pier at every post without changing how the building goes up.
Photo Deck footing beside a protected tree — screw set inside the drip line, no root disturbance.
How it works
A steel screw, turned into undisturbed soil.
The screw is a hot-dip galvanized shaft with a conical thread that displaces soil outward as it turns, compacting it rather than removing it. Capacity comes from the screw's diameter and the soil it sits in; length is chosen for the site. Nothing is excavated, nothing is formed, and nothing has to cure, so the footing takes its load as soon as it is set.
Step one
Sizing
Screw diameter, length and count come from the loads and the soil. We work these out with you, and per-job foundation design is available through an engineering house licensed in Georgia when a reviewer wants a stamp.
Step two
Driving
A low-speed, high-torque drive head turns each screw to its specified embedment. The handheld equipment reaches sites a mixer cannot, and the embedment is logged screw by screw.
Step three
Connecting
An insertable flange or bracket sets the structure on the screw at the height you need. Because there is no cure, the next trade starts the same day.
Ground screws vs. poured concrete
Same load capacity. None of the dig, haul, and cure.
A ground screw is a galvanized steel shaft driven into undisturbed soil to a rated depth. Here is how that changes a footing job.
Comparison of ground-screw foundations against poured-concrete footings across seven criteria.
Criteria
Ground screw
Poured concrete
Site work
No excavation
Dig, spoil, haul-off
Tree critical root zone
Driven, not dug — often proceeds without altering the CRZ
Digging inside the CRZ can trigger a Tree Conservation Plan, or be barred outright
Schedule to load
Same-day, load-ready
Days of cure time
Sloped, wet, or rocky sites
Works
Difficult
Tight or limited access
Handheld or compact drive
Needs truck access
Code capacity
ICC-ES ESR-4226 rated
Prescriptive / engineered
Removable & reusable
Yes — unthread and relocate
No — demolition
Building inside a protected tree's root zone.
Digging a footing means altering soil inside a tree's critical root zone, which is what a city's tree ordinance exists to restrict. A driven screw does not require that excavation, so it is often the shorter path back to a permitted project. The rule is different in every city, and the formula, the encroachment cap and the permit trigger all vary.
We have read Decatur, Atlanta, Sandy Springs, Brookhaven and Avondale Estates against their own ordinance text and set out what each requires.
Most of these arrive from someone mid-permit, mid-quote, or mid-argument with a site that will not cooperate.
Can you build a deck without concrete footings in Georgia?
Yes. A galvanized ground screw is a code-listed footing carrying the same design loads as a poured pier. Every screw is driven to a rated depth in undisturbed soil, and because nothing has to cure, the deck can be framed the same day the footings go in.
My permit was flagged over a tree's root zone. Now what?
This is the situation we see most. A dug footing removes soil from inside the critical root zone; a driven screw displaces it instead, without trenching or auguring through the root plate. Whether that satisfies your reviewer depends on the ordinance and the arborist, and those differ across metro Atlanta. Our tree and root-zone page sets out what each jurisdiction requires.
Can footings go through an existing concrete patio?
Yes. We bore through the slab at a diameter that clears the shaft and drive into the soil beneath. The patio stays, which is usually the point: a pergola or cover can go up over a slab nobody wants to demolish and re-pour.
What if a concrete truck cannot reach the site?
Then this is a straightforward job rather than a difficult one. The drive equipment is handheld, so it goes down a side yard, through a gate, or across a finished lawn. Nothing is excavated, so there is no spoil pile to barrow out afterwards.
How long does an installation take?
A typical ten-screw residential job is a single morning. There is no cure period, so your framing crew is not waiting on us and does not lose a day to the calendar.
What does it cost?
Pricing is per screw and turns on size, count, and how hard the site is to reach. Send us the site and the load and we will tell you whether screws are the right call — including when they are not, which happens on open, easily dug lots where a poured footing is simply cheaper.
Why it holds
Driven to a rated depth in undisturbed soil, and listed to code.
Each screw is driven to an embedment depth that corresponds to a rated bearing capacity for the soil it sits in. There is no forming, no rebar, no waiting on a pour — and no excavation to account for on a Tree Conservation Plan. The listing under ICC-ES ESR-4226 gives your plan reviewer and engineer a documented capacity to design against.
Hot-dip galvanized shaft and flights for corrosion protection below grade.
Embedment logged per screw — the verification ESR-4226 calls for.
Removable and reusable — unthread and relocate without demolition.
Photo A driven screw at final grade, ready for the beam.
Send us the site. We will tell you whether screws are the right call.